Topsoil cost by state

What topsoil costs per cubic yard delivered, across all 50 states and DC. The US baseline is $45, but the spread from the cheapest market to the priciest is about 61% — so where you live changes the budget more than almost any other single factor.

Reviewed by The CostToUpgrade Estimating Desk Last reviewed How we estimate

US national average

$45

per cubic yard delivered

Most expensive
$61HI
Least expensive
$38MS
Top-to-bottom spread
61%
Calculate your exact cost

Planning estimates, not quotes. Confirm locally.

Cost by region

Regional averages smooth out single-state noise and show the broad pattern.

Northeast

$50

+12% vs national · 9 states

Midwest

$43

-5% vs national · 12 states

South

$42

-7% vs national · 17 states

West

$48

+7% vs national · 13 states

What that means for a real project

National-average pricing applied to common project sizes:

Project size US average range
Small pour 3 yd³ $119 – $151
Patio 6 yd³ $238 – $302
Driveway 10 yd³ $396 – $504

Every state, ranked

All 50 states plus DC. The typical-project column applies each state's unit price to a 6 yd³ job.

Topsoil cost per cubic yard delivered by US state
State Region Unit price vs US avg 6 yd³ project
Alabama South $39 -14% $204–$260
Alaska West $58 +28% $304–$387
Arizona West $44 -3% $230–$293
Arkansas South $38 -15% $202–$257
California West $59 +30% $309–$393
Colorado West $47 +4% $247–$315
Connecticut Northeast $52 +16% $276–$351
Delaware South $46 +2% $242–$308
District of Columbia South $55 +22% $290–$369
Florida South $43 -4% $228–$290
Georgia South $41 -10% $214–$272
Hawaii West $61 +35% $321–$408
Idaho West $43 -5% $226–$287
Illinois Midwest $49 +8% $257–$327
Indiana Midwest $42 -7% $221–$281
Iowa Midwest $41 -8% $219–$278
Kansas Midwest $40 -11% $211–$269
Kentucky South $40 -12% $209–$266
Louisiana South $40 -12% $209–$266
Maine Northeast $46 +3% $245–$311
Maryland South $48 +7% $254–$324
Massachusetts Northeast $54 +21% $288–$366
Michigan Midwest $43 -5% $226–$287
Minnesota Midwest $46 +2% $242–$308
Mississippi South $38 -16% $200–$254
Missouri Midwest $41 -10% $214–$272
Montana West $43 -4% $228–$290
Nebraska Midwest $41 -10% $214–$272
Nevada West $46 +3% $245–$311
New Hampshire Northeast $48 +6% $252–$321
New Jersey Northeast $52 +15% $273–$348
New Mexico West $41 -9% $216–$275
New York Northeast $56 +24% $295–$375
North Carolina South $40 -11% $211–$269
North Dakota Midwest $42 -6% $223–$284
Ohio Midwest $42 -6% $223–$284
Oklahoma South $39 -14% $204–$260
Oregon West $49 +8% $257–$327
Pennsylvania Northeast $46 +2% $242–$308
Rhode Island Northeast $51 +13% $269–$342
South Carolina South $40 -12% $209–$266
South Dakota Midwest $41 -10% $214–$272
Tennessee South $40 -11% $211–$269
Texas South $42 -7% $221–$281
Utah West $44 -2% $233–$296
Vermont Northeast $47 +5% $249–$318
Virginia South $44 -2% $233–$296
Washington West $50 +12% $266–$339
West Virginia South $41 -10% $214–$272
Wisconsin Midwest $44 -3% $230–$293
Wyoming West $42 -7% $221–$281

Unit prices are the national baseline scaled by each state's relative construction cost index. Project totals apply a ±12% band to reflect normal quote variation.

Get real quotes

Compare local pros for topsoil

An estimate gets you a budget. A few competing quotes get you the real price. Tell us about the job and we'll help you find vetted contractors nearby.

Get matched

How we build these numbers

We start from a US national baseline of $45 per cubic yard delivered and multiply it by each state's relative construction cost index, where 1.00 is the national average. Those indices are directional — they capture broad differences in trade wages, material freight, and permitting overhead, not street-level pricing.

The ±12% band on every figure is deliberate. It reflects the range we would expect between a competitive bid and a premium one for the same scope in the same market. If a quote lands far outside that band in either direction, the scope is probably different from what you think it is — that is worth a conversation before it is worth a signature.

Full detail on sources, review cadence, and what these estimates deliberately exclude is on our methodology page.

Topsoil cost by state: FAQ

How much does topsoil cost on average in the US?
The national baseline we use is $45 per cubic yard delivered. Applied to a typical patio project of 6 yd³, that works out to roughly $238–$302 in materials at the unit shown. Labor, delivery, tax, and site prep sit on top unless the unit label says "installed."
Which states are most and least expensive for topsoil?
The five priciest markets in our index are Hawaii, California, Alaska, New York, District of Columbia — Hawaii runs about $61 per cubic yard delivered. The five cheapest are Mississippi, Arkansas, Oklahoma, Alabama, South Carolina, with Mississippi near $38. Top to bottom that is a spread of roughly 61%, which is why a national average alone is a poor budgeting tool.
Why does the same project cost so much more in some states?
Four things move the number: prevailing wage rates for the trades, freight distance from the nearest supplier or plant, permitting and inspection overhead, and local demand. Labor is usually the biggest lever — in high-wage metros it can be well over half the installed price. Freight matters most for heavy, low-value materials like concrete, gravel, and block, where hauling costs rival the material itself.
Are these numbers quotes?
No. They are directional planning figures built from a national baseline and a relative state cost index, and they are deliberately shown as ranges. Use them to sanity-check a bid or set a budget, not to negotiate a contract. Two contractors in the same ZIP code can legitimately differ by 20–30% based on crew size, backlog, and scope assumptions.
How do I get a number for my specific project?
Run the Topsoil Calculator with your own dimensions and your local unit price. The calculator does the quantity math exactly; this page just tells you what unit price is realistic where you live. Together they give you a defensible budget before you call anyone.