Size a portland cement plaster job before you order. Enter the wall dimensions, deduct windows and doors, and pick a traditional three-coat or a one-coat system to get the 80 lb bags of base coat, the sheets of expanded metal lath, and a material cost. Coverage assumes an 80 lb bag spreads about 25 square feet at 3/8 inch.

Reviewed by The CostToUpgrade Estimating Desk Last reviewed How we estimate

Your project

Dimensions

Total run of wall being stuccoed — add all elevations together.

Measure from the weep screed up to the soffit or top of wall.

An average window is about 15 ft²; a 3 × 7 ft door is 21 ft².

Material

The factor is base-coat demand ÷ one 3/8 in coat. The 1/8 in finish coat is bought separately.

Pricing

Bagged stucco base coat commonly runs $10–$16 per 80 lb bag.

Estimate

28bags

Base-coat bags (80 lb) · Scratch + brown; finish coat is separate

Net wall area
300ft²
Metal lath sheets
21sheets
Estimated base-coat cost
$336.00

Estimates are guidance only and exclude tax, labor, and site conditions unless stated. Confirm with a local pro.

How it's calculated

No black boxes — here is the exact math behind your estimate, so you can check it or adapt it for your own quote.

  1. 1Net wall area (ft²) = wall length × wall height − openings
  2. 2Base-coat bags = ⌈ (net area ÷ 25 ft² per bag) × system factor ⌉ (three-coat = 2.33: 3/4 in of scratch + brown, plus ≈15% to key the lath)
  3. 3Lath sheets = ⌈ (net area ÷ 16 ft² per sheet) × 1.10 ⌉
  4. 4Cost = base-coat bags × price per bag

Worked example

A 40 ft run of 9 ft wall with 60 ft² of windows and doors, finished in traditional three-coat stucco.

Inputs

Wall length
40 ft
Wall height
9 ft
Openings to deduct
60 ft²
Stucco system
2.33
Price per 80 lb bag
12 $/bag

Result

Base-coat bags (80 lb)
28 bags
Net wall area
300 ft²
Metal lath sheets
21 sheets
Estimated base-coat cost
$336.00

Tools & materials for this project

As an Amazon Associate we may earn from qualifying purchases, at no extra cost to you.

  • Plaster hawk and trowel The two tools you carry all day applying scratch and brown coats.
  • Stucco scratcher rake Combs the horizontal keys into the scratch coat so the brown coat bonds.
Get real quotes

Compare local pros for stucco

An estimate gets you a budget. A few competing quotes get you the real price. Tell us about the job and we'll help you find vetted contractors nearby.

Get matched

Frequently asked questions

What is the difference between three-coat and one-coat stucco?
Traditional three-coat is a 7/8-inch system over metal lath: a 3/8-inch scratch coat, a 3/8-inch brown coat, and a 1/8-inch finish. One-coat systems (really two coats) use a fiberglass-reinforced 3/8-inch base over rigid foam and lath, then the same finish. That is why this calculator multiplies base-coat demand by 2.33 for three-coat — 3/4 inch of scratch plus brown, which is twice a single 3/8-inch coat, plus about 15 percent because the scratch coat also has to fill and key the metal lath — and by 1.0 for one-coat. Neither figure includes the 1/8-inch finish coat. Three-coat is thicker, more impact-resistant, and what most codes assume by default. One-coat goes up faster and adds insulation, but it must be an evaluated proprietary assembly installed exactly per its evaluation report.
What goes behind the stucco?
Over wood framing, the IRC and ASTM C1063 call for two separate layers of weather-resistive barrier — typically Grade D building paper or house wrap — then self-furring expanded metal lath fastened into the studs, plus casing bead, corner aid, and a weep screed set at least 4 inches above grade or 2 inches above paved surfaces. The furring dimples hold the lath about 1/4 inch off the paper so the scratch coat can key behind it. Over concrete or CMU, stucco can bond directly with a bonding agent and no lath. Flashing at every penetration matters more than the mix itself.
Why does stucco need control joints?
Cement plaster shrinks as it cures and moves with temperature, so ASTM C1063 limits an unbroken panel to 144 square feet with no dimension over 18 feet, and requires a joint wherever the length-to-width ratio exceeds 2.5 to 1 or the framing changes — at floor lines, for instance. Skip the joints and that movement shows up as random cracking, usually running diagonally out of window corners. Accessory joints are installed with the lath, before any base coat goes on, and cannot be retrofitted later, so lay out your panels while the lath is going up.
How long between coats, and does stucco need to be kept damp?
For three-coat work, give the scratch coat at least 48 hours before the brown coat, and let the brown coat cure 7 days before the finish. Some specs allow shorter intervals in warm weather, but 48 hours and 7 days are the common defaults. Moist-cure each base coat by fogging it once or twice a day for the first 48 hours, more often in hot, dry, or windy conditions. Stucco gains strength by hydration, not by drying out — rushing the schedule or letting a coat flash-dry is the usual cause of crazing and weak bond.
Does this include the finish coat and labor?
No. The bag count and cost here cover base coat only — scratch and brown for three-coat, or the single base for one-coat. Finish coat is a separate product sold by color and texture; an 80 lb bag covers roughly 40 to 60 square feet at 1/8 inch depending on how heavy the texture is, so budget about 5 to 8 extra bags for the 300 square feet in the example. Paper, lath, weep screed, corner aid, control joints, scaffolding, and labor are all extra. Installed three-coat stucco commonly runs $9 to $15 per square foot. Treat every number here as a planning estimate: the assembly itself is governed by your local building code and the evaluation report for the system you buy, and a licensed plastering contractor or your building inspector has the final say.