Slope and Grade Calculator
Enter the vertical rise and the horizontal run and get the slope four ways: percent grade, angle in degrees, a 1-in-N ratio, and the true length along the slope. Set a target grade — 2% for drainage, 8.33% for an ADA ramp — and the calculator back-solves the fall you need over that run.
Your project
Estimate
Grade · 2% ≈ 1/4 inch of fall per foot
- Angle
- 2.86°
- Ratio — 1 in
- 20
- Length along slope
- 20.02ft
- Fall needed for target
- 0.4ft
Estimates are guidance only and exclude tax, labor, and site conditions unless stated. Confirm with a local pro.
How it's calculated
No black boxes — here is the exact math behind your estimate, so you can check it or adapt it for your own quote.
- 1
Grade (%) = rise ÷ run × 100 - 2
Angle (°) = arctan(rise ÷ run) - 3
Ratio = 1 in (run ÷ rise) - 4
Slope length = √(rise² + run²) - 5
Fall needed = run × target grade ÷ 100
Worked example
A yard that drops 1 ft over a 20 ft run, checked against a 2% drainage target.
Inputs
- Rise (vertical)
- 1 ft
- Run (horizontal)
- 20 ft
- Target grade
- 2 %
Result
- Grade
- 5 %
- Angle
- 2.86 °
- Ratio — 1 in
- 20
- Length along slope
- 20.02 ft
- Fall needed for target
- 0.4 ft
Tools & materials for this project
As an Amazon Associate we may earn from qualifying purchases, at no extra cost to you.
- 4 ft box level Shim one end an inch to check a 2% drainage fall.
- Rotary laser level kit Shoot grades across a whole yard with a receiver and rod.
Compare local pros for slope & grade
An estimate gets you a budget. A few competing quotes get you the real price. Tell us about the job and we'll help you find vetted contractors nearby.